The CCS vehicle arrives
If included, the CCS vehicle joins first and requests charging. The selected mode determines how the available budget is allocated.
Energy management
A charging installation shares electrical capacity with the rest of the site. Dynamic load balancing coordinates the power available to compatible chargers around configured limits, the building’s demand and the requirements of the installation.
One site. The same arriving vehicles.
If included, the CCS vehicle joins first and requests charging. The selected mode determines how the available budget is allocated.
Use Next step to explore arrivals and departures at your own pace.
This comparison gives priority to the vehicles that arrived first. Later arrivals receive the remaining budget or wait. The total remains capped: this is an illustrative priority rule, not a simulation of physically uncontrolled charging.
Time-compressed conceptual sequence. OFF uses a bounded first-arrival priority rule, not physical uncontrolled charging. Shown allocations and battery changes are illustrative, not measured or guaranteed delivered power or charging times. This does not control real chargers and is not a complete electrical model.
OFF · First-arrival priority example. The CCS vehicle arrives. Building demand: 20 kW. Available for charging: 80 kW. Allocated in the example: 60 kW.
Energy management · Dynamic load balancing
Charging often shares an electrical connection with a building or other equipment. Load balancing adjusts the power assigned to compatible chargers within configured limits as the site’s other demand changes.
Define the relevant site or panel limit around the installation’s electrical design. The setup must reflect the actual circuits, chargers and measurement available.
When other consumption rises, less capacity remains for charging. When it falls, the available charging budget can increase within the configured limits.
Use site-specific settings rather than one assumption for the whole network. The allocation strategy and required equipment are agreed during technical assessment.
Load balancing explained
No. It manages the power already available within configured limits. It does not increase the physical connection capacity or replace electrical protection and a correctly designed installation.
Assess the AC supply and site limits, individual phases and circuits, charger capabilities and suitable consumption measurements together. The equipment and configuration must reflect the actual electrical installation.
Less of the configured site budget remains for charging. Charging allocations can decrease accordingly. When other demand falls, more power can become available, subject to charger and vehicle limits.
The simulator is simplified. Actual charging also depends on the vehicle’s battery-management system (BMS), state of charge (SOC), battery temperature, real voltage, equipment limits, minimum charging current, connectivity and site configuration.
Yes. Site-specific electrical limits and operating requirements should guide each configuration. The settings for one building should not be assumed to suit every location in a network.
See the platform in context
Show us your operating model, existing equipment and plans. We can walk through the backend, load balancing and white-label options around the questions that matter to your project.
Send your request through our contact form. We will agree the next steps with you.